"附件三:",,, "工程",,, "表3.1",,, "工程信息",,,, "建筑类型",,"多层小高层高层", "工程类型",,"住宅楼底商住宅楼写字楼宾馆综合办公楼其他()", "工程地点",,, "开工日期计划开工日期" "竣工日期计划竣工日期",,, "合同类型",,"固定总价合同固定单价合同可调价合同其他()", "计价方式",,"清单计价定额计价", "工程价格",,"结算价格预算价格", "结构类型",,"混合结构框架结构剪力墙结构框架剪力墙结构钢结构其他()", "抗震设防烈度",,, "有无人防",,"有无", "层数",,"地上:","地下:" "檐高(m)",,, "标准层高(m)",,, "建筑面积(㎡)",,, "其中","地上建筑面积(㎡)",, ,"地下建筑面积(㎡)",, "建安造价(万元)",,"合同价:","结算价:" "平米造价(元/㎡)",,, "建筑工程","地基处理",, ,"基础","基础类型:基础底标高:", ,"墙体","外墙类型、厚度:", ,,"内墙类型、厚度:", ,"柱",, ,"梁",, "建筑工程","板",, ,"是否使用商品混凝土","是否", ,"主要混凝土标号","基础混凝土标号:", ,,"主体结构混凝土标号:", ,"防水","地下室:", ,,"卫生间:", ,,"厨房:", ,,"屋面:", ,"保温","屋面:", ,,"外墙:", "装饰工程","地面","垫层:", ,,"面层:", ,"楼面","找平层:", ,,"面层:", ,"内墙面",, ,"天棚",, ,"外墙面",, ,"门窗",, "安装工程","电","强电:", ,,"弱电:", ,"水","给水:", ,,"排水:", ,"采暖","", ,"通风",, ,"消防",, ,"楼宇智能",, ,"电梯",, ,"燃气",, "其它说明事项",,, "清单计价工程造价统计表" "工程名称:单位:元" "表3.2-1(清单计价) "项目\费用",,"分部分项费用"措施项目费用",,"其他项目费用","规费","税金" ,,"人工费",,"材料费",,"机械费",,"企业管理费和利润","技术","组织",,, ,,"定额人工费","动态调整","定额材料费","动态调整","定额机械费","动态调整",,,,,, "建筑工程" "装饰工程" "安装工程","电气" ,"给排水" ,"采暖" ,"通风" ,"消防" ,"楼宇智能" ,"电梯" ,"燃气" "清单计价工程造价统计表" "工程名称:单位:元" "表3.2-2(定额计价) "项目\费用",,"人工费",,"材料费",,"机械费",,"措施费",,"规费","企业管理费和利润","税金" ,,"定额人工费","动态调整","定额材料费","动态调整","定额机械费","动态调整","技术","组织",,, "建筑工程" "装饰工程" "安装工程","电气" ,"给排水" ,"采暖" ,"通风" ,"消防" ,"楼宇智能" ,"电梯" ,"燃气" "主要工程量表",,,, "工程名称:",,,, "表3.3",,,, "项目名称",,"单位","工程量","备注" "建筑工程","土石方","m3",, ,"地基处理","m3",, ,"砌筑","m3",, ,"混凝土","m3",, ,"钢筋","t",, ,"防水","㎡",, ,"保温、隔热","㎡",, ,"模板","㎡",, "装饰工程","楼地面","㎡",, ,"内墙面","㎡",, ,"外墙面","㎡",, ,"天棚","㎡",, ,"门窗","㎡",, "安装工程","电线","m",, ,"电缆","m",, ,"电气管","m",, ,"给水管","m",, ,"排水管","m",, ,"暖气管","m",, ,"燃气管","m",, ,,,, "单项工程人工及主要材料消耗量统计表",,, "工程名称:",,, "表3.4",,, "名称","单位","总消耗量","单价" "人工","工日",,"元/工日" "钢筋","t",,"元/t" "钢材","t",,"元/t" "商品混凝土","m3",,"元/m3" "水泥","t",,"元/t" "石子","m3",,"元/m3" "砂子","m3",,"元/m3",, ,,,,, ,,,,, ,,,,, "有关说明:1.本年度上报上年度的拟建、在建和已完工程.2.上报工程的预算书要有电子版和书面版.3.上报工程的有关信息和数据(即表1~4)要有电子版和书面版.4.表3.1中建筑类型:多层——混合结构;小高层——15层及以下;高层——15层以上.5.表3.1中凡选择"其他"的,还需填写具体的内容.6.表3.1中"主体结构混凝土标号"分墙、梁、板柱,分别填写.7.清单计价的工程填写表3.2-1;定额计价的工程填写表3.2-2.8.表3.2中各项目的统计依据省2011计价依据各专业定额.9.表3.4中的人工总消耗量不包括机上人工.10.表3.4中的水泥、石子和砂子数量仅考虑现场搅拌混凝土配合比中的,如为商品混凝土,则此三项不填.11.表3.4中的钢材包括各种板材、型材、管材.12.表3.4中"单价"为人工和各材料的信息指导价格." "附件四:",,, "建筑工种人工成本信息表",,, "单位:元",,, "序号","工种","日工资","说明" "1","建筑、装饰工程普工",,"1.每工日为小时;" "2","木工(模板工)",,"2.日工资中包括下列哪些内容:" "3","钢筋工",,"养老保险" "4","混凝土工",,"失业保险" "5","架子工",,"医疗保险" "6","砌筑工(砖瓦工)",,"工伤保险" "7","抹灰工(一般抹灰)",,"生育保险" "8","抹灰、镶贴工",,"住房公积金" "9","装饰木工",, "10","防水工",, "11","油漆工",, "12","管工",, "13","电工",, "14","通风工",, "15","电焊工",, "16","起重工",, "17","玻璃工",, "18","金属制品安装工",, "注:本表中日工资要求填报该工种的合同单价.",,,