CENTER FOR INTEGRATED FACILITY ENGINEERING
Formalizing Construction Sequencing Constraints for Rapid Generation of Schedule Alternatives
By
Bonsang Koo and Martin Fischer
CIFE Working Paper #75 January 2003
STANFORD UNIVERSITY
Copyright 2003 by
Center for Integrated Facility Engineering
If you would like to contact the authors, please write to:
c/o CIFE, Civil and Environmental Engineering Dept., Stanford University Terman Engineering Center Mail Code: 4020 Stanford, CA 94305-4020
2
Formalizing Construction Sequencing Constraints for Rapid Generation of Schedule Alternatives Bonsang Koo, Martin Fischer Abstract
Construction planners today use CPM-based schedules to represent the planned logical sequence of activities to perform a project. A construction schedule typically represents the sequence of multiple trades that perform individual work while sharing common workspaces or resources. The logic or "rationale" behind activity sequences of these schedules can include physical relationships between components (e.g., supported by), trade interactions (e.g., workspace competition) or safety and code regulations (e.g., testing). Due to changing project demands, planners frequently need to modify activity sequences during the course of a project. More than one alternative can exist, and hence planners need to develop and evaluate alternative sequences correctly and rapidly to make well-informed decisions. When developing sequencing alternatives, planners need to understand the physical or technical "role" an activity plays on following activities. They also need to distinguish between activities that may or may not be delayed. Planners infer the role and "status" (i.e., whether an activity may be delayed) of activities based on the initial rationale and flexibility of the constraints between activities. However, the current CPM framework only distinguishes the temporal aspects of constraints (e.g., FS precedence relationship) and only distinguishes the time-criticality of activities. Consequently, determining the role and status of activities can only be performed in the planner's minds. Hence, identifying and developing sequencing alternatives using CPM-based schedules is today an error-prone and time-consuming process. In this paper, we introduce research to determine how sequencing constraints can be represented to enable planners to describe rationale accurately. We also introduce an activity classification mechanism that can be used by a computer system to automatically determine the role and status of activities. We describe a formalized process that utilizes the representation and classification mechanism to assist planners in developing sequencing alternatives correctly and accurately. Finally, we discuss the necessary research to validate the generality and power of the proposed approach more fully.
- summertimegone > time-criticality
-
time-criticality
下载该文档 文档格式:PDF 更新时间:2003-01-01 下载次数:0 点击次数:1文档基本属性 文档语言: 文档格式: pdf 文档作者: fhq 关键词: 主题: 备注: 点击这里显示更多文档属性 经理: 单位: rc 分类: 创建时间: 上次保存者: 修订次数: 编辑时间: 文档创建者: 修订: 加密标识: 幻灯片: 段落数: 字节数: 备注: 演示格式: 上次保存时间:
- 下载地址 (推荐使用迅雷下载地址,速度快,支持断点续传)
- PDF格式下载
- 更多文档...
-
上一篇:绵阳市中小企业局
下一篇:绵阳市中小企业局
点击查看更多关于summertimegone的相关文档
- 您可能感兴趣的
- summergone summertime inthesummertime summertime歌词 summertimelove newssummertime katesummertime summertimegonemv summertime什么意思 gmtsummertime
- 大家在找
-
- · 下载的word文档打不开
- · 帕拉丁改装发动机
- · 公安执法规范化建设
- · 手机电池容量
- · 捷达改装led大灯
- · 马奶葡萄和提子的区别
- · cpu降温圣手中文版
- · 三星i9100格式化sd卡
- · 土木工程材料学
- · 金正昆商务礼仪
- · 优秀员工心态培训讲义
- · 2012流行歌曲
- · 高频小信号放大电路
- · 2012教育学心理学试题
- · 大学生生涯规划与就业指导重庆科技学院
- · 宾得kx双头套机
- · 初中化学实验教学论文
- · 2012年公务员上班时间
- · 后进生的转化策略
- · 不死咒怨迅雷下载
- · 闽教版小学英语教案
- · 中国近现代史纲要视频
- · 磨浆机图片
- · 北师大版初二数学视频
- · 船用柴油机
- · 小学环境教育教案
- · 变速器换挡叉夹具零件图
- · 叶燮,泰山云,法
- · 四川农业大学一本校区
- · 雨中登泰山ppt
- 赞助商链接